Hydro-Quebec- Chutes des Passes substation

In conjunction with the construction of Hydro-Quebec’s Péribonka substation, Electro Saguenay had the mandate to build a 14.4 à 34.5 KV substation for the energy provisioning of the Péribonka building site.
Customer: Hydro-Quebec
Location: Chutes des Passes, Quebec Province
Year: 2004

Project details

Construction of a 35 KV substation including:

– Excavation and backfilling of trenches
– Concrete foundations and holding tanks
– Installation of grounds
– Provisioning and installation of structures
– Provisioning and assembly of instrumentation
– Connection of instrumentation
– Transformer oil removal and filling
– Preoperational testing
– Preoperational certification